List of Ceres Demolition Projects
The following table provides a brief synopsis of the many demolition projects completed by Ceres NZ from July 2011 through 2013.
Project / Property | Address |
Area (SqM)
|
Levels
|
Structure Type |
---|---|---|---|---|
Radio Network House | 155 Worcester |
6334
|
14
|
External Concrete Moment Frame |
244 Salisbury | 244 Salisbury Street |
800
|
2
|
Concrete Tilt Panel |
Avonmore | 202 Cashel |
1414
|
11
|
Concrete |
NZI House | 96 Hereford St |
6440
|
11
|
External Concrete Moment Frame |
Waters Edge Apts | 5 Tidal View |
8453
|
10
|
Tilt Slab |
SBS Building | 180 Manchester |
3131
|
9
|
Post Tensioned Slab |
BDO Building | 138 Victoria St |
5535
|
9
|
Concrete |
Lumley Building | 138 Victoria |
2671
|
7
|
Concrete Columns/Steel Beams |
129 Kilmore St | 129 Kilmore St |
2300
|
5
|
5 Story Office, Concrete Frame |
Harvey Cameron Building | 93 Cambridge Ter |
1350
|
4
|
4 Story Office |
Mayfair Building | 140 Lichfield St |
1837
|
4
|
Brick and Timber |
Shades Arcade | 108 Hereford |
3212
|
4 & 2
|
Concrete |
Exclesior Hotel | 120 ManchesterSt |
1800
|
3
|
Heritage facade stabilization and building demo |
Televising Station | 340 Durham St |
526
|
2
|
Concrete Frame |
Asian Market | 78 Lichfield St |
1246
|
2
|
Brick and Timber |
Totalpos | 147 Kilmore |
550
|
2
|
Block and Concrete |
211 Gloucester | 211 Gloucester |
1383
|
2
|
Block and Concrete |
Old Warehouse | 227 Waltham |
1916
|
2
|
2 Story Wherehouse |
Cathedral | Barbadoes St |
–
|
–
|
Heritage selective demo |
AMI Warehouse | 47 Fitzgerald |
3040
|
1
|
Block and Concrete |
Residential Houses | 747 & 749 Main Road |
175
|
1
|
Timber frame |
AA Building | 210 Hereford St |
2389
|
7
|
Concrete Frame – UHR only |
Latimer View House | 215 Gloucester St |
1433
|
5
|
2-way concrete slab, block walls |
Gough House | 90 Hereford St |
1788
|
5
|
Concrete encased steel beams |
Platinum Sports | 217 Gloucester St |
2920
|
9
|
External Concrete Moment Frame w/ Double Ts |
Orion Buildings | 218B & 218 H Manchester St |
8045
|
5 & 4
|
2 buildings – Concrete encased steel beams and Concrete frame construction |
Allan Pyatt House | 153 Hereford St |
2540
|
8
|
Concrete Frame w/ flat slab flooring |
Commercial Building | 355 Lincoln Rd |
1200
|
1
|
Block and Concrete |
VI Block | 11 Matipo St |
255.6
|
1
|
Brick and Concrete Warehouse |
Gough Block | 77-85 Cashel St |
2070
|
2
|
Brick and timber frame |
ECAN Building | 60-64 Kilmore |
5100
|
4
|
Concrete Frame Building |
Burger King Building | 699 Colombo |
2000
|
4
|
Commercial Building |
BNZ Building | 137 Armagh St |
5000
|
10
|
Commercial Building |
Ferrymead Bridge | Post Tensioned Concrete Bridge | |||
Hazeldean Carpark | 14 Hazeldean Road |
14000
|
5
|
Precast Carpark Building |
67 Victoria St | 67 Victoria St |
600
|
2
|
Brick and timber frame |
Canterbury Brewery | 36 St.Asaph |
24000
|
Industrial Complex | |
Smiths City Building | 156 Moorhouse |
1800
|
2
|
Retail/Office Building |
Ashburton Hospital | Ashburton |
2000
|
2
|
Brick and Timber |
Crystal Plaza | 79 Cathedral Square |
2000
|
3
|
Concrete Moment Frame |
Civic Buildings | 163 Tuam St |
13000
|
6
|
Concrete Moment Frame |
Charles Luney Building | 250 Oxford Terrace |
4800
|
5
|
Concrete Moment Frame |
Office Building | 12 Moorhouse |
2000
|
2
|
Concrete and Steel |
Office Building | 96 Oxford Terrace |
2000
|
2
|
Concrete |
Apartments | 100 Oxford Terrace |
1000
|
3
|
Concrete Moment Frame |
Kate Sheppard Retirement Homes | 417 New Brighton road |
10000
|
2
|
Concrete and Timber |
Gayhurst Bridge | Gayhurst Rd Bridge Deck |
400
|
1
|
Concrete |
Avonside Girls High School | 180 Avonside Drive |
2280
|
2
|
Brick and Timber |
St Mary’s Merivale | 30 Church Lane, Merivale |
1200
|
2
|
Brick and Timber |
55 Armagh | 55 Armagh St |
1548
|
4
|
Precast Building |
Agility Logistic | 5 Robin Mann Place |
2400
|
2
|
Industrial Complex |
The Ex-Christchurch Police Building | 42-48 Hereford St |
14000
|
16
|
Concrete |